8.1.6. Removal and installation of a cooler of ATF


Details of installation of a cooler of ATF


Scheme of connection of lines of a path of cooling of ATF

 PERFORMANCE ORDER

  1. Remove a decorative front grille.
  2. Disconnect hoses from assembly of a cooler of ATF.
  3. Release fixture and remove assembly of a cooler.
  4. Remove a basic arm of a cooler of ATF.
  5. Release fixing collars and remove the hoses going from a cooler to a radiator and to transmission (see the illustration Scheme of Connection of Lines of a Path of Cooling of ATF).
  6. Turn out bolts of fastening of a basic arm of a tube of a cooler.
  7. Remove a hose assembled with a basic arm.
  8. Installation is made upside-down — track that all fixture was tightened a support with the required effort.
  9. In conclusion check the ATF level, in case of need make the corresponding adjustment (see the Head Routine maintenance).